Otmuchów Dam Development – Otmuchów, Poland

Otmuchów Dam Development – Otmuchów, Poland

Otmuchów, Poland • Water Infrastructure & Hydropower

Project Overview

With a reservoir spanning over 20 square kilometers, the Otmuchów Dam also generates hydroelectric power. It originally featured two Kaplan turbines with a combined installed capacity of 4.8 MW. Each turbine operated at a water flow rate of 21.5 m³/s and a hydraulic head (height difference) of approximately 16 meters. This integration of renewable energy reflects Acopex’s early commitment to sustainable engineering and resilient infrastructure.

Project Highlights

  • Project: Otmuchów Dam Development
  • Client: Regional Water Authority of the Weimar Republic
  • Location: Otmuchów, Poland
  • Sector: Water Infrastructure & Hydropower
  • Project Size: 20.6 km² reservoir with a capacity of 130 million m³
  • Duration: 60 months (1928–1933)
  • Contract Type: Public Infrastructure – Design-Bid-Build
  • Consultant: Undisclosed