123 Street, New York, USA info@example.com +012 345 67890
Turawskie Lake Dam – Turawa, Poland

Turawskie Lake Dam – Turawa, Poland

Turawa, Poland • Water Infrastructure & Environmental Engineering

Project Overview

Acopex Construction proudly contributed to the development of the Turawskie Lake Dam, a landmark hydraulic and environmental engineering project situated on the Mała Panew River near Turawa, Poland. Designed primarily for flood control, irrigation support, and water management, the dam also integrates a small-scale hydroelectric facility, contributing renewable energy to the region.

Delivered through an Integrated Project Delivery (IPD) model over six years, this collaborative approach ensured effective coordination with government bodies and local stakeholders—supporting both infrastructure excellence and community engagement.

Key Features & Impact

  • Flood mitigation and river regulation across the Opole Voivodeship
  • A 24 km² artificial reservoir enabling irrigation and environmental stability
  • A small-scale hydroelectric plant, enhancing regional energy resilience
  • Promotion of biodiversity and creation of a thriving recreational zone
  • Long-term asset for sustainable land and water resource development

Legacy

The Turawskie Lake Dam stands as a testament to Acopex Construction’s capability in delivering multi-functional infrastructure—combining water control, clean energy generation, and ecological stewardship into one integrated solution.

Project Highlights

  • Project: Turawskie Lake Dam Development
  • Client: Government of the Second Polish Republic
  • Location: Turawa, Poland
  • Sector: Water Infrastructure & Environmental Engineering
  • Project Size: 24 km² reservoir area
  • Duration: 72 months
  • Contract Type: Integrated Project Delivery
  • Consultant: Undisclosed
← Back to Projects